- Home
-
Resources
- Center for Hydrogen Safety
- Hydrogen Safety Panel
- Hydrogen Fuel Cell Codes and Standards
- Web-based Toolkits
- Learnings & Guidance
- Paper & References
- Contact
- About H2Tools
Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.
In any event, the lesson that should be derived from this incident is the fact that the explosion could have been avoided either by using an inert gas instead of air across the diaphragm, or by monitoring the hydrogen concentration in the upper…
As demonstrated by the fire discussed above, lack of adequate maintenance, system monitoring and oversight of maintenance of these facilities can contribute to the ignition of a fire that is difficult to extinguish and poses an extreme danger to…
This incident illustrates how a hydrogen fire which appears to be 'quite small' can actually be only the visible portion of a much larger fire. Observation alone is not a reliable technique for detecting pure hydrogen fires and/or assessing their…
An important lesson to be derived from this incident is the need to carefully engineer and test all repairs and modifications to high-pressure process equipment.
This incident illustrates how difficult it is to completely purge hydrogen out of a large, complex piece of equipment. Uniform mixing and dilution is unlikely in all the partially enclosed spaces, crevices, etc. If a hazardous operation such as…
This incident illustrates the danger of hydrogen being inadvertently released through blown water seals. Similar incidents have occurred in non-nuclear industrial facilities, but offgas systems present a special hazard because of the…
The mechanisms and rates by which hydrogen gas is generated and subsequently accumulated in the holding tank need to be fully understood by vendors and employees alike. Active venting, warning signs, and local alarms designed to activate when…
The above described events are an indication of a potential licensee/vendor interface problem. Based on the information received, the vendor was not completely informed via the purchase specifications regarding the service condition to which the…
The hydrogen facility does not meet industrial guidelines for facilities of this type, from the standpoint of (1) the separation distance needed between a hydrogen pipe break and the building ventilation intake to prevent buildup of a flammable…
The lesson to pass on is that ventilation is critical in UPS battery rooms. Great care should be taken to ensure that the ventilation system is operational and brings in enough outdoor air to properly ventilate the enclosure.
Electrical…
The accident proves that under special circumstances, the potential hazard connected with unforeseen microbial gas formation and accumulation should not be neglected. Thus, to avoid new accidents at the paper mill described above, the tower has…
This incident highlights the need to properly design safety interlocks. These safety interlocks need to be carefully incorporated into the initial building/plant designs and should consider all of the unexpected occurrences, such as the…
The investigative report noted that the explosion could have been prevented by (among other things) a continuous gas analyzer test of oxygen and hydrogen product purity. The continuous analyzer should be interlocked to shut the electrolyzer down…
Normally hydrogen fires are not extinguished until the supply of hydrogen has been shut off due to the danger of re-ignition and explosion. During a gas leak/fire, it is important to shut off the source of the hydrogen if it is safe to do so. If…
Lessons Learned The site initiated the establishment of a field patrol and strengthened their onsite monitoring of mechanical equipment during a plant-wide temperature rise.
Lessons Learned
Construction errors are difficult to detect once construction is complete. It is important to develop and use a systematic oversight process for minimizing construction errors during the construction process.
…
The uncontrolled release of hydrogen occurred as a result of the rupture of the No. 6 hydrogen storage tube’s burst disc. This disc failed in response to being overloaded by mechanical stresses developed as water expanded and formed ice while in…
Although a functional fire protection system would have helped to extinguish the fire, a properly installed hydrogen detection system, coupled with a properly designed ventilation system, could have prevented the incident altogether.
…
Routine maintenance activities on pressurized hydrogen systems should be conducted per written design specifications. The procedures should provide detailed oversight regarding bolt, nut and fitting replacements or repairs. A formal review…
Key:
We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.