Corrective actions included replacing the breakaway with a new one, which restored normal operation of the dispenser.
Verify and periodically inspect the pull/separation force adjustment if the breakaway is so equipped.
Additional…
A new best practice resulted resulted from this incident. It states that before any work is started, a third party should verify with a visual inspection that the actual equipment to be used matches the planned equipment list/protocol.
Do not interconnect hydrogen drain trap lines with other drain lines
Thoroughly inspect equipment installation to manufacturer’s installation instructions
Warn against unauthorized field modifications
Consult the…