  1. Fittings need to be visually inspected to insure ferules are in place and correctly positioned prior to swageing.
  2. Research staff are responsible for communicating system specifications [gas type,…

After this accident, a safety inspection team was organized. An investigation of this incident and an inspection of all other experimental equipment was conducted by the team. As a result of this inspection, the heaters are now hard-wired to the…

The above described events are an indication of a potential licensee/vendor interface problem. Based on the information received, the vendor was not completely informed via the purchase specifications regarding the service condition to which the…

The investigative report noted that the explosion could have been prevented by (among other things) a continuous gas analyzer test of oxygen and hydrogen product purity. The continuous analyzer should be interlocked to shut the electrolyzer down…

Work documentation (work orders and baseline drawings) should reflect the current system configuration.

Recommendations

  1. Develop procedures for temporary change configuration control of high-pressure systems. The…

Implementing and enforcing the laboratory's stop work and restart policy and procedures in conjunction with peer reviews for new processes and experiments should help prevent future accidents due to a lack of recognition of potential reactions…

An important lesson to be derived from this incident is the need to carefully engineer and test all repairs and modifications to high-pressure process equipment.

This occurrence underscores the importance of completing a hazard analysis for each different process. Non-safety-related systems or equipment may be used for purposes other than their primary purpose so long as potential hazards are identified…

1. Evaluate any change in normal procedures or conditions for storage of aluminum hydride products. In this case, the aluminum hydride material was typically stored at -35°C in the glove box freezer. However, due to a change in glove boxes, this…

  1. Inadequate Safeguards - The system was designed with low-point drains to facilitate water removal, however, these were found to be inadequate in both location and size. The fact that the mixed feed pre-heat coil was not self-draining was…

In the future, refining, petrochemical, and chemical industries need to review material verification programs to ensure that the maintenance procedures include sufficient controls and positive material identification (PMI) testing to prevent…

The lesson to pass on is that ventilation is critical in UPS battery rooms. Great care should be taken to ensure that the ventilation system is operational and brings in enough outdoor air to properly ventilate the enclosure.

Electrical…

Hazard analysis should consider potential leak locations, potential ignition sources in the vicinity, and the potential for accumulating flammable gases in that area.

Users should leak-check all cylinders upon installation. This event…

In the future, this mesoporous carbon material and ammonia borane:mesoporous carbon material will be handled under anaerobic conditions (glove box) to prevent further incidents.

Normally hydrogen fires are not extinguished until the supply of hydrogen has been shut off due to the danger of re-ignition and explosion. During a gas leak/fire, it is important to shut off the source of the hydrogen if it is safe to do so. If…

Lessons Learned The site initiated the establishment of a field patrol and strengthened their onsite monitoring of mechanical equipment during a plant-wide temperature rise.

  • Quantitative control of tightening torque on bolts…

Lessons Learned
Construction errors are difficult to detect once construction is complete. It is important to develop and use a systematic oversight process for minimizing construction errors during the construction process.

Although a functional fire protection system would have helped to extinguish the fire, a properly installed hydrogen detection system, coupled with a properly designed ventilation system, could have prevented the incident altogether.

In addition to resealing the glove box window, a positive pressure of argon gas was maintained inside the glove box while the course of action was planned. Subsequently, the glove box was cleaned up by specialized hazardous materials personnel…

  • All tank trailers should have a safely accessible auxiliary shut off valve in case of spills.
  • Emergency personnel need to have access to all of the appropriate protective clothing, including shoes. Liquid hydrogen is stored at 20…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts