Contributing Factors

Change in Procedures, Equipment, or Materials

Damage and Injuries

Any

Equipment

Piping

Probable Cause

Any

Contributing Factors

Change in Procedures, Equipment, or Materials
Show more

Damage and Injuries

Any

Equipment

Piping

Probable Cause

Any
Show more

CHECK OUT OUR MOST RELEVANT INCIDENT LISTINGS!

Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.

Because of the near invisibility of a hydrogen flame in daylight and hydrogen's extremely low ignition coefficient, if a known leak is present (e.g., an audible hissing), ignition should always be presumed. The primary cause of this incident…

  1. The dilution water for making a polythionic acid aqueous solution was changed from industrial water to pure water to lower the chlorine concentration in the piping.
  2. Water that accumulated in the drain was removed before heating…
  1. The plant tried to increase production and decrease workload, but failed to notice the potential negative outcomes of this change.
  2. It is necessary to thoroughly simulate all potential negative outcomes of a change in procedures…
  • Operation and management of the hydrodesulfurization unit should be strengthened to account for abnormal phenomena such as local corrosion.
  • The safety review system for remodeling existing equipment and facilities should be…
  1. Inadequate Safeguards - The system was designed with low-point drains to facilitate water removal, however, these were found to be inadequate in both location and size. The fact that the mixed feed pre-heat coil was not self-draining was…

In the future, refining, petrochemical, and chemical industries need to review material verification programs to ensure that the maintenance procedures include sufficient controls and positive material identification (PMI) testing to prevent…

Installation

  1. Fittings need to be visually inspected to insure ferules are in place and correctly positioned prior to swageing.
  2. Research staff are responsible for communicating system specifications [gas type,…

An important lesson to be derived from this incident is the need to carefully engineer and test all repairs and modifications to high-pressure process equipment.

  1. Provide additional retraining of operators. Curriculum should emphasize the proper response to high oxygen in the hydrogen gas.
  2. Evaluate current knowledge of operators. Operators should know…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts