The SS 24-inch pipe that failed was replaced with 1-1/4 Cr 1/2 Mo alloy pipe that is corrosion-resistant to SCC. A revised HTS bypass piping layout was installed to prevent the hazardous conditions that lead to the failure. A detailed hazard…
An investigative communication notes that "mechanical integrity programs at refineries repeatedly emphasize inspection strategies rather then the use of inherently safer design to control the damage mechanisms that ultimately cause major process…