A previously identified generator hydrogen gas leakage into the stator cooling water system exceeded the predetermined maximum operational allowance and the nuclear plant was shut down from 100 percent power in accordance with plant operating procedures. The leak was identified by monitoring the stator water cooling system detraining tank. Following reactor shut down and generator rotor removal, a small hole was located in the collector end winding area of a slot on the top stator bar. A small particle of carbon steel (estimated to be 2 mm/0.078 inch by 0.6 mm/0.023 inch) is believed to have caused the damage. The source of the carbon steel particle was either foreign material introduced during previous generator internal work or from a phenomenon called "back-of-core burning", where electrical arcing caused the release of internal metal particles. See Attachment 1 for additional details.

The magnetized carbon steel particle vibrated with the changing magnetic field of the generator (60 Hz). This motion, along with the magnetic attraction of the stator bar, acted as a driver to bore through bar insulating tape and eventually into and through the surface of the hollow copper strand. The penetration of the generator strand caused the steep increase in monitored hydrogen in-leakage that necessitated the nuclear plant shutdown. This event did not affect nuclear safety.

Shutdown/outage activities to repair the hydrogen leakage in the stator cooling water system included identification and repair (plugging) of the damaged generator strand as well as thoroughly cleaning and magnetic sweeping of generator internals.

Lessons Learned
  1. Incorporate external operating experience lessons learned into site program controls. Other nuclear plants had similar strand failures and back-of-core issues that were not evaluated for impact on procedures or system/component health plans.
  2. Be more sensitive to precursor indications of declining system/component health; in this case the main generator. Insensitivity resulted in material condition deficiencies and elevated risks to generation that are undesirable given the economic importance of this high-value asset.
  3. Follow OEM and industry recommendations for component (stator) preparation for testing and lay-up.
  4. Have a detailed component (generator) Life-Cycle Management Plan.

Additional details regarding probable causes and lessons learned can be found in Attachment 2.

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts