The packing in the flow control valve should be replaced periodically. A planned investigation will determine the optimum time period for packing replacement.
Lessons Learned
Construction errors are difficult to detect once construction is complete. It is important to develop and use a systematic oversight process for minimizing construction errors during the construction process.
…
Included inspection on monthly preventive maintenance plan and evaluated alternate materials for better cold-weather performance.