Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.
The site needs to implement a good Operational and Readiness Inspection procedure. System inspection deficiencies need to be identified, and (if possible) reviewed by a second party before future tests are conducted. This inspection could include…
Routine maintenance activities on pressurized hydrogen systems should be conducted per written design specifications. The procedures should provide detailed oversight regarding bolt, nut and fitting replacements or repairs. A formal review…