Fire on an Alkaline Electrolyzer (1065)
A fire broke out on the insulating plastic elements of an alkaline electrolyzer in a unit of a chemical plant. The shift saw the smoke from the control room. The first action was to drain the potash into a tank provided for this purpose and to shut down the electrolyzer. The on-call electrician interrupted the electricity. The safety technician brought the fire under control in less than 10 minutes using CO2 extinguishers. After approximately six hours, the unit is restarted.