The fire started 3 hours after being shut down. The unit was shut down and the fire extinguished.The oven contained only gaseous products and mainly hydrogen.
At least one person was injured in an explosion at a theatre building. The investigation concluded that the accident has been caused by hydrogen entering the sprinkler room from the sprinkler piping…
Hydrogen leak due to a fault with non-process related battery equipment.After reporting the hydrogen leak, fire crews have been called to a gas terminal. The leak was due to a fault with non-process…
The event occurred during the decommissioning of a nuclear power plant. It involved a tank containing 100 kg of residual sodium from the decommissioned experimental nuclear reactor which was using…
An in-line inspection of the hydrogen pipeline was being conducted and prior to the last run of the in-line inspection tool (mfl), hydrogen gas was released and ignited from a blind flange connection…
This near miss occurred at metal smelting unit of a foundry. At 9:45 a.m., due to a power outage, the cooling pumps of two furnaces containing nickel and chromium stopped. One of the two furnaces…
A deflagration occurred during shutdown of a reactor used for ammonia synthesis. It was followed by a jet fire. The hydrogen leak was probably due first to the lower seals, followed by another leak…
The explosion occurred while restarting the ammonia reactor. Synthetic gas (70% H2) was released at the flange of the relief valve of the turbo-compressor. The explosion was followed by a jet fire.…
The incident affected the raw material buffer tank (design pressure 0.38 MPa) of a diesel hydrogenation unit in a refinery. This buffer tank is located between the hydrogenation reactor and the raw…
At the time of the incident, the desulfurization unit was shut down for scheduled cleaning of a cooling tower with reintroduction of a gas mixture into the system at a high hydrogen content. The…
The explosion occurred in a Litol benzene unit, when it was being restarted following a scheduled shutdown for maintenance. The explosion followed the release of about 30 kilograms of hydrogen gas…
An explosion occurred at a chlorine production plant during the restart of the installation. An hydraulic syphon had probably been blocked by fire extinguishing products following a previous fire on…
Explosion in condenser area two hours after the unit tripped (due to a stator earth fault). The stator earth fault had damaged two hydrogen cooler tubes, which allowed hydrogen to pass from the…
The explosion occurred at the hydrogen producing unit of a refinery.A solution of potassium carbonate was being drawn off from an absorption tower to a temporary storage tank for a turnaround…
On September 1, 1992, an explosion in this facility occurred due to an accidental release of hydrogen at the Institute of Energy Conversion, University of Delaware, US. Hydrogen gas was used in…
The day before the incident, the outlet pipe connected to methanation reactor started leaking gas, which contains hydrogen. The leak was temporarily eliminated by a pressurised plug. On the day of…
The event occurred in the steam condensing line of the residual heat removal system the nuclear reactor. Radiolysis generated hydrogen and oxygen which then accumulated in high concentration in the…
This incident occurred when subcontractor two workers were widening air vents on the roof of a building hosting a tank containing hydrogen chloride solution. This intervention was necessary to to…
This incident occurred at the electrolyzer of a refuelling station. An employee of the electrolyzers manufacturer was on-site to conduct a reset of the plant power breaker system and to restart gas…
This incident occurred unit at a demonstration of a new technology for the catalytic cracking of vacuum residual oil. An oil storage tank failed due to high pressure. The overpressure in the tank was…