Weld Failure on Hydrogen Transmission Pipeline Causes Leak (1057)
Release from a welding of a hydrogen transmission pipeline At 12:45 pm the operation control centre (OCC) recognised that a customer flow and pressure dropped significantly. At 13:28 the OCC made the decision to close the upstream remote operated valve. At 15:00 the pipeline technician arrived on site and confirmed the breach in the pipeline. Additional pipeline operations technicians were deployed to isolate both manual block valve upstream and downstream of the incident site.