Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.

The simplicity of this situation has made us aware that increased consideration must be given to all aspects of the workplace when preparing preliminary hazard assessments. Some hazardous situations appear so trivial that they can be easily…

Hazard assessment is critical during the design, fabrication, and installation of system modifications to ensure hazards and potential hazards are addressed prior to system start-up and operation.

Personnel should be aware that items requiring special receiving inspections should still be verified/examined by the end user prior to use.

Given that the anaerobic chamber and associated nearby electrical equipment were not designed or…

All chemicals, including gases, should be clearly labeled and expiration dates (if applicable) identified. Incidents are more common when incompatible chemicals are mixed or when chemicals are stored/transferred using incompatible equipment.…

The manufacturer will be notified of the failed parts identified as a result of the follow-up testing plan. These results may be useful to them for their information and forwarding to others with the same equipment.

Designs for high-tech systems/components evolve based on operating experience. The design changes should resolve identified deficiencies and are part of a continuous improvement process to increase reliability and productivity.

Laboratory accidents can happen despite the best preparation and careful attention to procedures. However, the lesson to be learned here is that employees must always be sure they understand the hazards of the activities, and that they know how…

Diligence needs to be practiced when performing assigned work tasks. To guard against complacency, it is necessary to emphasize adherence to established procedures, including appropriate reviews of preventive maintenance instructions (PMI) and…

The lessons learned in this situation center around basic conduct of operations principles. Policies and procedures related to operations performance, safety performance, and management oversight were in place. They were not employed…

On-site personnel performing treatment of reactive metals/chemicals must continue to exercise caution. Although there is an inherent risk in treating reactive metals/chemicals, personnel must adhere to conduct of operations principles to include…

Thoroughly plan and schedule work such that the correct tools are at the job site. If activities take place that take the job supervisor away from the job location while critical steps are to be performed, the work should be temporarily stopped.…

  • Verify that all PRDs contain fuse-backed adapters.
  • Explore elimination of rupture disk PRDs and substitution of spring-style relief valves.
  • Develop new hydrogen unloading procedure using a written checklist. * Add…

Investigation determined that internal galling has caused the failure rendering the needle valve unusable. The galling was caused by a stainless steel stem acting against a stainless steel seat. This failure mode had been observed before and the…

For the use of mechanical fittings in hydrogen service, administrative controls should be in place, as in this case, to ensure that leak testing is conducted on a regular basis. It should never be assumed that every fitting is tight. Additional…

Failure of a diaphragm is not infrequent, but the seizure of the main nut threads is very rare. The manufacturer claimed this had never occurred before with this type of unit. The broken plunger is likely the result of poor instructions/…

The visiting intern had several years of experience in research projects and tasks that were similar to those in progress at this laboratory. This led to the incorrect assumption that formal introductory training for this laboratory was…

After the aforementioned incident, a rigid cage was designed to protect the reactor from external conditions, and to protect the contents of the hood and any experimenter from the reactor, in the event of a pressure burst from the reactor cell.…

High-pressure fueling hoses should be examined daily for signs of external damage, including corrosion, abrasion, cuts, and kinking. High-use fueling hoses should be replaced every six months.

  1. Revise fire protection operations surveillance tests to include a maximum of 110% of the agent net weight to prevent over-filled cylinders from being placed in service.
  2. Identify cylinders currently in service that exceed the 110…
  • The fuel cell vehicle that was involved in the accident has been retired. The fuel cell power plant from that vehicle has been removed and is being used in another fuel cell vehicle.
  • The fuel cell vehicle accident reinforced the…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts