Unidentified Hydrogen Pipeline Leak Leads to Rerouting and Repairs (1058)
At 17:30 on 5 may 2019, the pipeline operator was notified by a third party that there was a possible leak on its hydrogen pipeline, as identified by sound. Operator personnel arrived on the site at 18:30 and confirmed that hydrogen was present in the area. The location was in an isolated area. Manual isolation valves were shut to close in the segment and it was manually blown down. At 08:52 on of the day after the operator determined that the incident met reportable criteria and called the national response centre at 09:22.