Even if a small experiment is being run inside a fume hood, the best practice is to use a dedicated vent line for hydrogen which vents hydrogen to a safe location outside. This is especially recommended for planned venting. This practice avoids situations where flammable mixtures could develop. Each system is unique and should be evaluated and approved for use independently…
Such a compressor should NOT be used for hydrogen. There are many issues with converting a compressor to hydrogen service. First and most important, this must be approved by the manufacturer. Examples of concerns for a non-hydrogen compressor used for hydrogen service include (but are not limited to):
The HSP recommends against the use of glycols for pressure tests due to the difficulty of adequately removing all glycol that might be left in a system after a hydrotest. The HSP recommends a pneumatic test at 110% of the system maximum allowable working pressure (MAWP), which is acceptable by code. Due to an increased danger with pneumatics vs hydrotesting, establish a pressure test zone for…
The Panel recommends performing a pressure test at 110% of design pressure. This requirement should be applied to all systems regardless of construction type since the intent is to ensure pressure integrity and proper installation. All fitting types have modes of failure during installation. For example, there are numerous examples where compression fittings have had ferrules installed…
The code used for repair and alterations of an existing system depends on the code used for construction as well as on the requirements imposed by the jurisdiction. Note that getting a permit from the jurisdiction may be necessary for an extensive alteration.
Code of Construction | Generally Accepted Code for Repair and Alterations… Category: Piping Keywords: Piping, Codes
The requirements of the code used for the original construction apply. The piping may meet the requirements of more than one code. In which case, the code used for changing the rating may be different than the original code of construction. In any case, the re-rated system should meet all of the requirements of the selected code. Note that if the original proof test of the system was… Category: Piping Keywords: Codes, Piping, Requirements
At least three of the ASME B31 piping codes are logical choices:
Considerations for code selection include:
Category: Piping Keywords: Piping, Codes, Requirements
Hydrogen affects the mechanical properties of most materials. For example, hydrogen reduces the Category: Piping Keywords: Pipeline, Material Compatibility, ASME Standards, Pipeline Safety