Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.
Installation
Fittings need to be visually inspected to insure ferules are in place and correctly positioned prior to swageing.
Research staff are responsible for communicating system specifications [gas type, Maximum Allowable…
Parallel-path design activities require an increased level of management oversight and control to mitigate the risks inherent in this process.
Schedule pressure cannot be allowed to compromise the integrity of the design process.
…
This occurrence highlights the need for ensuring work is organized and planned in a manner that is practical and efficient. The primary lesson learned from this occurrence is that personnel must be cognizant of the impact of their actions on…
This occurrence demonstrated the use of data by engineering to evaluate equipment problems. As the data changed, highlighting a problem with one-half inch PVC ball valves, the facility redesigned the valve extension and valve handle to prevent…
Management should ensure that a complete and thorough review of the previous work activities identified in the work package is performed at the pre-job briefing for the planned work. Work activities should be discontinued if any confusion exists…
Hydrogen distribution lines should be designed and carefully inspected to ensure process equipment in the area is correctly and safely installed. Equipment subject to vibration should not be placed in contact with hydrogen lines or with other…
The manager in charge acknowledged that, while he made relatively recent modifications to the high-pressure gas storage side of the system and had directed a major rebuilding of various units, the moderate-pressure interconnecting system (the…
This occurrence points to the importance of gathering and organizing all applicable administrative controls and other commitments prior to commencing work. It also re-emphasizes the importance of attention to detail, not only by the person…
When performing maintenance evolutions, proper work control processes must be in place to insure that process systems are adequately prepared, remain in a safe energy state during the maintenance evolution, and are properly restored afterwards.…
In this case, failure to recognize a run of tubing still maintaining pressure could have been avoided if such information was provided in a safety briefing. Knowledge of any job is the utmost importance in promoting and maintaining a safe working…
Some hydride materials (e.g., sodium alanates) may be rapidly exothermic, even pyrophoric, if exposed to water or humid air or slowly exothermic, even pyrophoric, if exposed to oxygen. Reactive materials, including fine metal powders, should be…
This incident highlights the need to ensure that the performance of special procedures does not place facility equipment in a condition that could lead to entry into a LCO.
This incident occurred due to moisture in the sample line monitoring system. Removing moisture from the sample line increases the reliability of the equipment. Further evaluations are being considered for improving system reliability.
This occurrence underscores the importance of appropriate design, equipment selection, and design review; the potential drawbacks of sharing utilities with other facilities; and the need to simplify [in this case, glove box atmosphere…
Unprotected hoses are susceptible to glass shards, abrasion, and burns during normal use. This leak was formed from a glass shard penetrating the tube wall.
Flexible hoses require protective sheaves to avoid cuts, abrasions and burns…
This occurrence underscores the importance of completing a hazard analysis for each different process. Non-safety-related systems or equipment may be used for purposes other than their primary purpose so long as potential hazards are identified…
Procedures will be revised to include specific information about hydrogen sensors and alarm controls. Caution will be added about sparks and flames in the fuel cell operation area. Workers will be cautioned that shunt resistors may reach high…
Whenever a new program or organization is created, management should ensure that program interfaces and new responsibilities are clearly defined. Effective program integration is necessary to ensure that all responsibilities and requirements are…
All safety devices worked as designed thereby protecting the environment and laboratory personnel. Researchers involved in the experiment acted properly and with the parameters set forth in operational procedures.
Follow up: Stops have…
Equipment that is designed to provide a safety barrier must be stringently tested upon installation.
A procedure requiring annual testing of both excess flow valves, which includes proper seating for closure and proper flow, has been…
Key:
- = No Ignition
- = Explosion
- = Fire
Equipment / Cause | Equipment Design or Selection | Component Failure | Operational Error | Installation or Maintenance | Inadequate Gas or Flame Detection | Emergency Shutdown Response | Other or Unknown |
---|---|---|---|---|---|---|---|
Hydrogen Gas Metal Cylinder or Regulator | 3/31/2012 4/30/1995 2/6/2013 |
4/26/2010 | 12/31/1969 | 3/17/1999 11/1/2001 12/23/2003 |
|||
Piping/Valves | 4/4/2002 2/2/2008 5/11/1999 |
4/20/1987 11/4/1997 12/31/1969 8/19/1986 7/27/1991 12/19/2004 2/6/2008 10/3/2008 4/5/2006 5/1/2007 9/19/2007 10/31/1980 |
2/7/2009 | 1/24/1999 2/24/2006 6/8/1998 12/31/1969 2/7/2009 |
10/3/2008 | ||
Tubing/Fittings/Hose | 9/23/1999 8/2/2004 8/6/2008 9/19/2007 |
1/1/1982 | 9/30/2004 10/7/2005 |
10/7/2005 | |||
Compressor | 10/5/2009 6/10/2007 8/21/2008 1/15/2019 |
10/5/2009 | 8/21/2008 | ||||
Liquid Hydrogen Tank or Delivery Truck | 4/27/1989 | 12/19/2004 1/19/2009 |
8/6/2004 | 12/31/1969 | 1/1/1974 | 12/17/2004 | |
Pressure Relief Device | 7/25/2013 5/4/2012 |
1/15/2002 1/08/2007 |
12/31/1969 | ||||
Instrument | 1/15/2019 | 3/17/1999 12/31/1969 2/6/2013 |
11/13/73 | ||||
Hydrogen Generation Equipment | 7/27/1999 | 10/23/2001 | |||||
Vehicle or Lift Truck | 7/21/2011 | 2/8/2011 12/9/2010 |
|||||
Fuel Dispenser | 8/2/2004 5/1/2007 6/11/2007 9/19/2007 |
2/24/2006 1/22/2009 |
|||||
Fuel Cell Stack | |||||||
Hydrogen Cooled Generator | 12/31/1969 2/7/2009 |
||||||
Other (floor drain, lab anaerobic chamber, heated glassware, test chamber, gaseous hydrogen composite cylinder, delivery truck) |
11/14/1994 7/21/2011 |
7/27/1999 6/28/2010 8/21/2008 |
12/31/1969 3/22/2018 |
6/10/2019 |
- = No Ignition
- = Explosion
- = Fire