The lessons learned from this incident are:

Verify the gas that you are using.
Avoid using "quick-disconnect" fittings in this type of situation. If they are absolutely needed, there are sets available that ensure that…

The incident resulted from an inadequate design for the storage location of the copper gas supply tubing (too close to an electrical outlet). The gas supply tubing was too long for its intended purpose and posed a hazard in its coiled state near…

The direct cause of the over-pressurization of the two drums was the repackaging of the phosphoric acid into metal UN1A1 drums and the resultant hydrogen gas generation within the sealed drums. At the time of this incident (1997), 49 CFR and…

Active GH2 sensors should be installed and continuously monitored in all enclosed buildings near GH2 sources. All buildings near areas where hydrogen is used should be designed to preclude GH2 entrapment (e.g., sloping roof with ventilation at…

Safe storage and transportation of balloons filled with a hydrogen-oxygen mixture is a very risky undertaking. There are few scenarios that do not involve enclosed spaces (e.g., a car) and the potential for static discharge. Perhaps a mesh bag…

Although the preparation-for-transport procedures were done the same way they were done for previous outreach programs, this time it proved to be a different situation. It is not clear what caused the ignition of the first balloon, which then set…

Recommendations:

The using organization should define necessary activities in order to place hydrogen systems in long-term periods of inactivity. The defined activities should address requirements for rendering inert, isolation (i.e.,…

Several procedural and design changes should be considered for the future:

Replace the use of pure hydrogen with a 95:5 mixture of nitrogen and hydrogen to reduce the possibility of an explosive atmosphere occurring. Laboratory personnel…

The turbine components that caused the vibrations were a retrofit design which had been in service for about two years and were under warranty from the vendor. The root cause analysis of the event determined that the damage was caused by a defect…

All installed and certified safety and emergency systems functioned as designed.1. The fuel cell turned off immediately after fire detection.2. The fire suppression system was immediately initiated thereafter.3. The physical separation of the…

Place signs on all liquid hydrogen tanks indicating that no water is to be put on the vent stack.
An additional secondary backup vent stack was added to liquid hydrogen tanks. This secondary stack is designed to be used only if needed in…

Many accidents reported from paper mills have much in common with this incident. Microorganisms in the process water with pulp produce hydrogen gas that mixes with air to form an explosive atmosphere. The ignition source is typically sparks…

Mounting hardware incorporated polymeric braces not suitable for long-term exposure to sunlight and temperature extremes. With time, the polymeric materials had disintegrated, allowing the mounting brackets to become loose. In addition, the…

To prevent a similar flashback, the following measures have been taken:

The valve is opened slowly to avoid a major leading shock into the venting line.
A special nozzle (Laval or similar) is mounted directly after the opening…

1. Increase physical protection, shielding, and securing of transported hydrogen tube valves, piping, and fittings from multi-directional forces that are likely to occur during accidents, including rollovers. Reference: 49 Code of Federal…

It is important to understand the requirements and standards associated with safe equipment design (especially electrical equipment containing an internal ignition source with flammable gas) in potentially explosive atmosphere environments.…

1. Management must ensure that operating decisions are not based primarily on cost and production. Performance goals and operating risks must be effectively communicated to all employees. Facility management must set safe, achievable operating…

The SS 24-inch pipe that failed was replaced with 1-1/4 Cr 1/2 Mo alloy pipe that is corrosion-resistant to SCC. A revised HTS bypass piping layout was installed to prevent the hazardous conditions that lead to the failure. A detailed hazard…

Metallurgical examination of the two failed disks by light optical microscopy (LOM), scanning electron microscopy (SEM), and energy-dispersive x-ray spectroscopic analysis (EDS) found them to be fabricated from pure nickel with evidence of…

1. Evaluate any change in normal procedures or conditions for storage of aluminum hydride products. In this case, the aluminum hydride material was typically stored at -35°C in the glove box freezer. However, due to a change in glove boxes, this…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / Cause Equipment Design or Selection Component Failure Operational Error Installation or Maintenance Inadequate Gas or Flame Detection Emergency Shutdown Response Other or Unknown
Hydrogen Gas Metal Cylinder or Regulator   3/31/2012
4/30/1995
2/6/2013
4/26/2010 12/31/1969     3/17/1999
11/1/2001
12/23/2003
Piping/Valves 4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/2009 1/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009

9/1/1992
10/31/1980

10/3/2008  
Tubing/Fittings/Hose   9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/1982 9/30/2004
10/7/2005
  10/7/2005  
Compressor   10/5/2009
6/10/2007
8/21/2008
1/15/2019
    10/5/2009 8/21/2008  
Liquid Hydrogen Tank or Delivery Truck 4/27/1989 12/19/2004
1/19/2009
8/6/2004 12/31/1969   1/1/1974 12/17/2004
Pressure Relief Device 7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969        
Instrument 1/15/2019 3/17/1999
12/31/1969
2/6/2013
    11/13/73    
Hydrogen Generation Equipment 7/27/1999     10/23/2001      
Vehicle or Lift Truck   7/21/2011         2/8/2011
12/9/2010
Fuel Dispenser   8/2/2004
5/1/2007
6/11/2007
9/19/2007
  2/24/2006
1/22/2009
     
Fuel Cell Stack            

5/3/2004
12/9/2010
2/8/2011

Hydrogen Cooled Generator       12/31/1969
2/7/2009
     
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
  11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
    6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire