Facility management confirmed that a hydrogen gas cylinder did not comply with the limiting condition for operation (LCO) for flammable gas control systems in the lab's safety requirements. Earlier erroneous calculations had shown that a release of the entire contents of the cylinder into the hood could not reach the lower flammability limit (LFL).

The facility manager determined that the LCO was applicable and immediately entered the action statement in the safety system, which required immediate termination of normal operations in the affected wing of the building. Because normal operations had already been terminated in the wing for HVAC maintenance, further efforts to terminate normal operations were not necessary. The hydrogen cylinder was removed from the hood, thus view more

A process area alarm activated. The alarm was caused by an instrument channel located above a reaction vessel off-gas system final HEPA filter canister, which indicated 25% of the lower explosive limit (LEL) for hydrogen. Since the only source of hydrogen is from the reaction vessel during the reaction of sodium with concentrated sodium hydroxide, the immediate actions were to shutdown the reaction process and place the facility in a safe condition.

The root cause was inadequate or defective design. Had the pre-filter drains been vented to outside the building, no hydrogen could accumulate in the process area. The corrective action for this is to complete an Engineering Task Authorization (ETA) to install a sample/drain collection system with loop seals to prevent any release of view more

Installation of a 9000-gallon liquid hydrogen storage tank by a lessee at a building has not been evaluated for effect on the Safety Authorization Basis (SAB) of nearby facilities.

During review of an Emergency Management Hazard Assessment document, a reviewer questioned whether the SAB of nearby facilities had been reviewed for the effect of the installed 9000-gallon liquid hydrogen tank. Reviews by the facility management and facility safety personnel confirmed the evaluations have not been performed.

The direct cause was determined to be a management problem, with policy not adequately defined, disseminated, or enforced to integrate potential lessee hazards into the facility safety program documentation on the 9000-gallon hydrogen tank and delivery. The existing policy view more