A steel tube with inner diameter of 6 mm and 10 m length was filled with radiolysis gas (stoichiometric H2-O2 mixture) at 70 bar for boiling water reactor simulations. Via a pneumatic valve, a venting line with similar cross-section and 2 m length, filled with atmospheric air, was connected.

For venting the tube, the valve was opened (fast) and an explosion occurred.

Explanation: Due to diffusion ignition in the leading shock, a flame flashed back into the pre-mixed reservoir and induced a detonation there. The tube system and involved measurement technique was destroyed. For safety reasons, the whole installation was set up in a protective container so that no person or other equipment was threatened.

A metal hydride storage system was refilled using compressed hydrogen in a closed lab environment. The tank system is an in-house development and is optimized for high hydrogen storage density and use with an air-cooled fuel cell. The system is equipped with a pressure relief valve that opens gradually at 35 bar to protect the tank from overpressure conditions. The tank itself is designed to adsorb 400 g of hydrogen at a pressure less than 15 bar.

For refueling, the secondary pressure on the compressed hydrogen supply container was set to 20 bar and the adsorption of the hydride was started without hydrogen flow limitation. Due to the exothermic nature of the hydride upon recharge, as expected a sharp increase in tank temperature was measured. The tank was uncooled because the view more